Your numbers
- Concrete
- 1.23 cu yd
- 33.3 cubic feet. With 10% extra: 1.36 cu yd
- 80 lb bags
- 62
- Includes 10% extra
- Slab area
- 100 sq ft
Free. Your numbers stay on this device until you create an account. Quantities for planning, not a price. Only a contractor who sees your site can price the job.
How to calculate concrete for a slab
Multiply length by width by thickness, with every measurement in feet, to get cubic feet. Divide by 27 to get cubic yards.
- Convert the thickness first: 4 inches is 4 ÷ 12 = 0.33 ft.
- A 10 × 10 ft slab, 4 inches thick: 10 × 10 × 0.33 = 33.3 cubic feet.
- 33.3 ÷ 27 = about 1.2 cubic yards.
Bags or a truck?
Pre-mixed bags suit small pours. As a guide, a 40 lb bag makes about 0.30 cubic feet, a 60 lb bag about 0.45, and an 80 lb bag about 0.60, so one cubic yard takes about 45 of the 80 lb bags. Past a cubic yard or so, most people order ready-mix by the yard, because mixing that many bags by hand is slow and the concrete won’t all set at the same time.
Allow a margin
Ground is never perfectly level and forms flex, so the hole usually holds a little more than the math says. Adding about 10 percent is common. The calculator shows both the exact figure and the figure with that margin.
What a contractor still decides
Thickness, reinforcement, the concrete mix, control joints and the base under the slab depend on the soil, the climate and what the slab will carry. Ask each contractor to state these in the written quote so you can compare like with like.